Misunderstanding easily caused by joining aluminum

2022-07-22
  • Detail

The gap in the installation of aluminum doors and windows is where most owners misunderstand the door and window manufacturers. They believe that the measurement personnel make a mistake or the aluminum doors and windows franchisees reduce the size of the windows. As long as the gap in the installation of doors and windows

Aluminum doors and windows franchising capacity is easy to misunderstand

aluminum doors and windows franchising http://www.yidunmc.com/agent/Most of the owners misunderstand the door and window manufacturers about the cracks in the installation. They think that the measurement personnel make mistakes or the franchisees of aluminum doors and windows reduce the size of the windows. As long as the 1-2cm gap in the installation of doors and windows meets the requirements, why should the aluminum doors and windows with broken bridges be reduced in the actual size? The main reason is that generally, building walls are not very standard. When measuring, door and window manufacturers always find the minimum point as the benchmark, so that the doors and windows can be well placed in the hole. If the size is just right, then the wall is not standard, and the level is not on the same line, then the doors and windows are difficult to correct, and the doors and windows with just good size are difficult to put into the hole. The broken bridge aluminum doors and windows are dead, and the material is hard, Therefore, it is normal to have a gap of 1-2cm during the installation of broken bridge aluminum doors and windows, and it is also normal to have a gap of 3-4cm in the blank wall

for the misunderstanding of cracks in the installation of broken bridge aluminum doors and windows, some time ago, our installation master went to a community to install broken bridge aluminum doors and windows. At that time, there was a 1-2cm gap in the doors and windows. Our master said that it could be solved by sending foam adhesive, but the owner felt that using cement filling was better than foaming agent. Later, the foreman also came, saying that this foam adhesive was better than cement. In fact, this was the case, because the cement applied later was exposed to the sun, After a long time, it will crack, and then the window will leak more. After some communication, we finally used styrofoam. Our master first filled the gap with styrofoam, waited for it to dry, cut off the expanded part, and then apply a layer of waterproof glue. In this way, the balcony will not leak. This waterproof glue is much stronger than cement. Therefore, it is very effective to send foam to places with large gaps when installing broken bridge aluminum doors and windows

we have also encountered misunderstandings about horizontal correction in the installation of broken bridge aluminum doors and windows. The main reason is that some walls are not standard. When installing windows, our master takes the inner windowsill as the standard and then corrects them. In this way, if some walls are not standard, it will appear that the windows look square inside, and the windows feel inclined from the outside, That is because the owner uses the wall as a horizontal reference, especially the non-standard wall, which leads to problems in the windows seen by the owner. Imagine that if the windows are not installed horizontally, it is impossible to open and close the doors and windows, so the installer will carry out horizontal correction in the installation process of broken bridge aluminum doors and windows

昆明男科医院

武汉妇科医院

济南肝病医院

Copyright © 2011 JIN SHI